Vessel Operations
Terminal operations may include:
- Berth planning
- Vessel compatibility review
- Arrival coordination
- Mooring coordination
- Cargo loading and discharge
- Transfer monitoring
- Marine safety procedures
- Departure coordination
Tanker Sizes
Public sailing information identifies Aoshan petroleum berths supporting vessels from smaller product tankers through large crude oil tankers.
Actual vessel acceptance depends on current draft, dimensions, berth availability, weather, port requirements and terminal approval.
Pre-Arrival Information
Before a vessel call, provide:
- Vessel name
- IMO number
- Q88
- LOA
- Beam
- Summer DWT
- Arrival draft
- Cargo
- Cargo quantity
- ETA
- Last port
- Next port